GLOBAL SPECIAL VEHICLE LEADER

Professional Special Vehicle Exporter

From China to the World — Trusted by 100+ Countries

20+ Years Experience
100+ Countries
100000+ Units Delivered
0+ Years of experience
0+ Countries served
0+ Units delivered
0% Customer satisfaction

Longxing telescopic crane production process presentation - A first-class product is made this way

Manufacturing Excellence

Longxing Telescopic Crane
Production Process Showcase

Shenbai is dedicated to the research and manufacturing of telescopic truck-mounted cranes, mobile cranes, and fixed lifting equipment. Our Longxing workshop is equipped with advanced domestic and international production machinery, mature manufacturing processes, and comprehensive quality inspection systems. Superior craftsmanship creates first-class products.

Longxing Telescopic Crane Workshop — Full Facility Overview

▲ Longxing Telescopic Crane Manufacturing Facility — Full Workshop Overview

Process Overview

The following showcases the complete production process of the Longxing telescopic crane — from raw material cutting through to final assembly and quality inspection. Key stages include: CNC cutting, hydraulic sheet bending, edge milling, boom tube welding & riveting, column and rotating arm fabrication, base leg assembly, boom assembly, and pipe fabrication.

01  Facility & Equipment

Advanced production equipment in the Longxing crane workshop

Advanced Production Equipment

Precision machining station for crane components

Precision Machining Station

02  CNC Cutting & Hydraulic Bending

CNC cutting area for crane steel plates

CNC Cutting Area

Hydraulic sheet bending process

Hydraulic Sheet Bending

Edge milling treatment for precision fit

Edge Milling Treatment

03  Boom Tube Welding & Riveting

Boom tube welding area — precision arc welding

Boom Tube Welding Area

Boom tube riveting and structural assembly

Boom Tube Riveting Area

Structural welding of crane boom sections

Boom Section Structural Welding

Structural component welding quality control

Structural Component Welding QC

04  Column & Rotating Arm Fabrication

Column welding area for crane mast structure

Column Welding Area

Rotating arm welding and assembly

Rotating Arm Welding

Column and rotating arm riveting process

Column & Arm Riveting

05  Base Leg Assembly

Base leg welding area for crane outrigger structure

Base Leg Welding Area

Base leg riveting and structural reinforcement

Base Leg Riveting

Base leg structural integrity inspection

Structural Integrity Inspection

06  Boom Assembly & Pipe Fabrication

Boom arm assembly area — telescopic section integration

Boom Arm Assembly Area

Hydraulic pipe fabrication and routing

Pipe Fabrication Area

Telescopic boom section fitting and alignment

Boom Section Alignment

Hydraulic system pipe installation

Hydraulic System Installation

Final pipe routing and connection verification

Pipe Connection Verification

07  Final Assembly & Quality Inspection

Full crane assembly and integration stage

Full Crane Assembly

Complete crane assembly and systems integration

Systems Integration

Pre-delivery quality inspection and load testing

Pre-Delivery QC Inspection

Load capacity and performance testing

Load & Performance Testing

Final inspection sign-off before delivery

Final Inspection Sign-Off

Shenbai Longxing Telescopic Crane — Finished Product

Shenbai Heavy Industry

Longxing Telescopic Crane

SHENBAI · PREMIUM TELESCOPIC TRUCK CRANE

Shenbai Longxing telescopic crane finished product display

Finished Product Display

Longxing crane ready for delivery inspection

Ready for Delivery

Shenbai Heavy Industry

Superior Craftsmanship  ·  Rigorous Testing  ·  Trusted Reliability

ISO Certified Manufacturing | Full Process Quality Control | Factory Direct Supply
Back to blog